Download-Deliverables-Traffic Hazards
WP 3 D 3.1.1 Specification Of Operational Situations, Goals and Behaviours

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several subsystems with response-times ranging from immediate reaction (safety net functions such as ACAS) more...


WP 3 D 3.1.2 Specification of Functional Requirements for Evaluation

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several subsystems with response-times ranging from immediate reaction (safety net functions such as ACAS), through tactical alerting systems (e.g. airport surface movement alerting) to inputs for strategic decision and planning aids.  
This document, the “Specification of Functional Requirements for Evaluation” for the Traffic segment of the NG-ISS: more...


WP 3 D 3.1.4 Definition of operational procedures

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several air-traffic awareness more...


WP 3 D 3.1.5 Report on Safety Implications of ASAS Package 1

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several air-traffic awareness and alerting subsystems with response-times ranging from immediate reaction (safety net functions such as more...


WP 3 D 3.2.1 Report on Critical Design Issues for HMI

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several subsystems with response-times ranging from immediate reaction (safety net functions such as ACAS) more...


WP 3 D 3.2.3 Evaluation Plan for Traffic PTE

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”).  The Traffic functionality of the NG-ISS groups several subsystems with response-times ranging from immediate reaction more...


WP 3.2.5 D 3.2.5 Report on Traffic part task evaluation

EXECUTIVE SUMMARY:
The FLYSAFE Project is concerned with the development of a prototype Next Generation Integrated Surveillance System (“NG-ISS”). The Traffic functionality of the NG-ISS groups several subsystems with response-times ranging from immediate reaction (safety net functions such as ACAS) more...





news

Final FLYSAFE Forum
FLYSAFE organises Final Forum 25th and 26th March 2009 in Amsterdam On 25th...
Read on

Summer Flight Test Experiments completed successfully
September 2009: In a period of two months a series of flight tests with two differents aircraft has...
Read on