Download-Deliverables-Operational Assessment
WP 111 - D 1.1.1 Final Operational Concept Description

EXECUTIVE SUMMARY:
This document is the formal output of WP 111 - Aircraft accidents & incidents analysis and definition of requirements. It constitutes the Operational Concept Definition (OCD) for the FLYSAFE Next Generation Integrated Surveillance System (NG ISS). The OCD starts to describe the current surveillance system and its situation, followed by the justification for and the nature of the desired changes. Subsequently it describes the FLYSAFE proposed solutions in terms of top level NG ISS functional requirements.
more...


WP 1.1.2 - D 1.1.2 Market Acceptability Pre-assessment

EXECUTIVE SUMMARY:
The WP 1.1.2 of FLYSAFE is dedicated to the pre-assessment of the market acceptability of the products, functions and systems, which are envisaged for development to contribute to the safety of the air traffic.

more...


WP 1.2.1 D 1.2.1-1 Overall System Specification - High Level

EXECUTIVE SUMMARY:
This document is the first contractual output of WP 1.2.1 “Overall System Specification and integration process definition”. It describes the overall functional architecture of the proposed FLYSAFE systems, including the ground and the airborne segments. The main functions of the FLYSAFE systems are then described in terms of functionality, required inputs and expected outputs. more


WP 1.2.1 D 1.2.1-2 Overall System Specification - FLYSAFE platform and test bed

EXECUTIVE SUMMARY:
This document is the second contractual output of WP 1.2.1 “Overall System Specification and integration process definition”. It describes the overall functional architecture of the proposed FLYSAFE systems as they will be developed during the project. more...


WP 1.2.1 D 1.2 Specification of the FLYSAFE system functions

EXECUTIVE SUMMARY:
This document is the third contractual output of WP 1.2.1 “Overall System Specification and integration process definition”. It describes, in more details than in D 1.2.1-1 and D 1.2.1-2, the overall functional architecture of the proposed FLYSAFE systems for the target product and as they will be developed during the project. more...


WP 1.3.1 - D 1.3.1 Certification Basis Analysis

EXECUTIVE SUMMARY:
This document is the formal output of WP 1.3.1 and as such constitutes the Certification Basis Analysis for the Next Generation Integrated Surveillance System (NG-ISS) of FLYSAFE. more...


WP 1.3.2 - D 1.3.2 preliminary Functional Hazard Assessment

EXECUTIVE SUMMARY:
Within the FLYSAFE preliminary Functional Hazard Assessment (FHA) report, the Next Generation Integrated Surveillance System (NG-ISS) main functions are assessed in terms of conceivable hazards that can be identified with respect to failure condition scenarios at aircraft level. The preliminary FHA, more...


WP 1.4 D 1.4 Matrix mapping the responsible partner to the relevant standard activity

EXECUTIVE SUMMARY:
This document is the contractual output of WP 1.4 “Definition of standard related activities”. It describes in detail the different topics of the standardisation activities identified during the last 9 month. For structuring the work in WP7.2 we have set up 5 internal working groups more...





news

Final FLYSAFE Forum
FLYSAFE organises Final Forum 25th and 26th March 2009 in Amsterdam On 25th...
Read on

Summer Flight Test Experiments completed successfully
September 2009: In a period of two months a series of flight tests with two differents aircraft has...
Read on