Once the scenarios have been defined, the detailed “specification of the test beds”, both for the FFS and for the FT aircraft, will be developed in this WP. For the FT use will be made of the requirements set up for the call for tender to detail the test bed and to set up a more precise installation plan.
NLR will lead and steer the set up of the specifications for the ATC simulator, FFS, Tower simulator and central weather processor.
| THALES coordinated the final formal review of the FLYSAFE project on 16 and 17 June 2009 at the... |
| Thales will coordinate the Final FLYSAFE EC review at the 16th and 17th of June in Toulouse. All... |
